What to Do the Day Before the Crane Arrives
In Short
Work this list the day before. Take the measurements, send the photos, unlock the gates, mark the utilities. If you cannot answer something, say so.
3 min readUpdated July 2026
The day before a crane visit, take three measurements: the weight of the item, the distance from where the truck can park to where the load lands, and the width and diagonal of anything it passes through. Send photos, unlock every gate, move the vehicles, and have someone there who can make decisions.
Grab a Tape Tonight
These are the numbers that get asked for on every job, and having them written down on a scrap of paper by the door turns a twenty minute morning conversation into a two minute one. Write down the answer even when you are not certain, and mark the uncertain ones so nobody treats a guess as a fact.
Do the walk yourself rather than reading it off a plan. Plans are drawn before the landscaping went in, before the neighbor built a carport, and before somebody parked a boat trailer along the side of the house. The tape measure sees the property as it actually is this week.
- Weight of the item, operating weight with fluids in it, plus the model number you got it from
- Length, width and height of the item with everything still bolted on
- Distance from where a truck can sit to the exact spot the load lands
- Width and diagonal of every gate, side yard or opening it passes through
- Height of the wall, roof line or fence the load has to clear
- Anything crossing overhead between the truck and the landing spot
The Photo Set, and Where to Stand for Each One
Photos answer questions a phone call cannot. The mistake is sending one close-up of the item and nothing else. What is needed is the geography of the job, and that means standing in specific places and shooting outward.
Hold the phone horizontally and step back further than feels necessary. A tight shot crops out exactly the thing an operator is looking for, which is usually a wire, a wall corner or a slope. Send them all in a single message with the measurements typed underneath so nothing gets separated from its context.
- From the street, looking at the property, wide enough to show the whole frontage
- From where you think the truck will park, looking toward the landing spot
- From the landing spot, looking straight back at the truck position
- Straight up from the landing spot, showing wires, limbs and eaves
- The item itself, with its data plate or model sticker readable
- The driveway surface, including any cracking, settling or patched trench
People, Keys, Markings and Honest Unknowns
The rest of the list is about the site being genuinely ready when the truck rolls up, not nearly ready. A crane that has to wait for a gate key or a neighbor's car is a crane that is not working.
Utilities are worth a note of their own. If anything on your property was trenched, buried or backfilled where the truck will sit, say so, and get locates marked if the work is on a schedule that allows it. That includes irrigation lines, septic tanks, leach fields, pool plumbing and propane runs, none of which show on a public locate.
And if you do not know something on this list, that is a perfectly acceptable answer. Say you do not know. An operator can plan around a stated unknown. What cannot be planned around is a guess presented as a measurement.
- Move every vehicle off the driveway and the street frontage the night before
- Unlock gates, and hand over a key or a code for anything locked
- Take gate leaves off their hinges if they will not swing fully clear
- Have the owner, superintendent or an empowered decision maker on site or reachable
- Confirm the following trade knows when the crane finishes
- Keep kids and pets inside for the duration, and tell the neighbor whose car is closest
- Mark or describe any buried utility, tank or irrigation line near the setup area
How the job runs
Our Process
Step 1: Walk it with a tape the evening before
Do the full walk yourself, from where the truck will park to where the load lands. Write down the numbers as you go rather than trusting them to memory overnight.
Step 2: Shoot the photo set in one pass
Six photos from the positions listed above takes about five minutes. Send them all at once with the measurements in the same message so nothing has to be chased.
Step 3: Clear, unlock and mark
Vehicles moved, gates open or unhinged, buried utilities noted, and anything fragile in the flight path relocated. Do this the night before, not while the truck is idling.
Step 4: Confirm the morning and the decision maker
A short call the day before confirms arrival time, who will be on site, and whether anything has changed. During the hot months that call is usually about starting earlier.
Scope
What Is Included
- A pre-job phone call to go through your measurements
- Photo review before the truck is dispatched
- Arrival time set around heat and the follow-on trade
- Rigging brought to suit the item you described
- A walk of the site with you before the outriggers go down
Answers
Frequently Asked Questions
What if I cannot find the weight anywhere?
Say so. An operator plans a setup with margin around a stated unknown far more comfortably than around a confident guess. Sometimes the model number alone is enough for us to find it.
Do I need to be home?
Someone with authority to make decisions does, either on site or reachable by phone and expecting to be called. Questions come up on almost every job and they need a fast answer.
Should I take my gate off?
If the leaf will not swing fully clear of the opening, yes, take it off the hinges the day before. A gate that only opens partway costs you the width you spent the day measuring.
How early do you start in the summer?
As early as makes sense for the job. Steel and roofing get unpleasant to handle well before midday in July and August, so long picks get scheduled at first light and the rest of the day belongs to the trades that follow.
What if something changes overnight?
Call. The phones are answered around the clock. A change we hear about at six in the morning is a plan adjustment. The same change discovered at the site is a lost morning.
More Guides
- What to Expect on Lift DayA walkthrough of lift day from arrival to departure, including how long each stage takes, what you can do, and why setup takes longer than the pick.
- Common Mistakes to AvoidEight mistakes that actually delay or stop crane jobs, from guessing the weight to booking before the pad has cured, and what to do instead.
- What Affects Your QuoteThe eight things that change what a crane job takes: weight, reach, access, ground, duration, travel, timing and rigging. No numbers here.
- Choosing the Right CapacityChoosing between the 22-ton and 40-ton boom truck is weight, distance and setup room together. Here is how the call gets made and what to send.
- How Mobile Crane Service WorksA mobile crane brings the machine and the operator to your site. Here is what happens from the first phone call through setup, the pick and pack up.
- Capacity and Reach ExplainedA 40-ton crane will not lift 40 tons at full boom. Here is what capacity ratings, load radius and 142 feet of reach actually mean for your job.
- Site Preparation ChecklistWhat to clear, move, unlock and check before a crane arrives. A prepared site keeps the visit short and stops problems being found at the worst moment.
- What to Expect on Lift DayA walkthrough of lift day from arrival to departure, including how long each stage takes, what you can do, and why setup takes longer than the pick.
- HVAC Unit Crane Placement GuideHow rooftop package units and condensers get craned on and off, how the work is sequenced with your HVAC contractor, and what a curb mismatch means.
- Truss Lifting Process and SafetyHow roof trusses get set with a boom truck: staging bundles, spreader bars, bracing, wind limits and keeping the crane in one position along the wall line.
Ready to schedule your lift?
Tell us the load, the site and the timing. We will confirm capacity, access and a window.