Heavy Lifting and Equipment Placement
Machinery Placement and Rigging in Lake Havasu City
3 min readUpdated July 2026
Machinery placement is the crane work of moving production and shop equipment from a trailer to its final spot on the floor. It covers reading the center of gravity, rigging to the manufacturer's lift points, clearing the door opening, and setting the machine level and shimmed on its pad.
The Center of Gravity Is Not in the Middle
Look at an engine lathe. The headstock, the gearbox, and the drive motor all sit at one end, and the tailstock end is comparatively hollow. A vertical press carries most of its mass in the ram and the crown. Neither one balances anywhere near the middle of its footprint, which is exactly where an eyeball guess puts the hook.
That matters most in the first inch of the lift. While the machine is still on the trailer deck, the deck is holding it up. The moment it breaks free, the only thing deciding which way it hangs is where the hook sits relative to the mass. Hook over the light end and the machine rolls, and it rolls quickly.
So the first inch happens on purpose. Up a hair, stop, watch. If it tips or wants to swing, it goes back down on the deck and the rigging changes: chain shorteners taken up on one leg, a different pick point, or the spreader bar shifted over the heavy end. Nobody muscles a rolling machine straight while it hangs. You reset and try again.
Rig to the Frame, Not to the Sheet Metal
Most production machines have designated lift points, and the manual shows exactly where they are. Cast eyes on the frame, threaded holes in the top casting, or a marked spot where a bar passes through the base. Those are the places the manufacturer decided load could travel through, and they were sized with a number behind them.
Everything else bolted to the machine is not structure. Chip guards, way covers, the pendant arm, the electrical cabinet, and any painted panel will fold if a sling goes under it. A control panel used as a lift point never ends well, because the panel is fastened to the frame with hardware chosen to hold a panel, not to hold a machine.
When a machine has no usable lift points at all, which happens with older iron and with anything rebuilt a couple of times, the pick gets planned around the base casting or a solid frame member instead. Slings go under or through it, padded where they touch, with a spreader bar keeping the legs vertical. If nothing on the machine is sound enough for that, we say so before the day, not with the truck set up.
Getting Through the Opening
A machine wider than the roll up door is a measuring problem before it is a crane problem. We want the clear door width, the header height, and the machine's widest point with handles, guards, and stands still attached. Sometimes a guard comes off and it fits. Sometimes the machine gets turned ninety degrees on the way in.
When nothing gets it through the door, the load goes over the wall instead. That changes the whole plan, because now the radius is fixed by where the truck can park outside and the boom has to clear the parapet or the roof edge with the machine hanging under it. Radius, not weight, usually decides whether that version works.
Either way the numbers get checked with a tape well before the truck rolls, not while a machine hangs off the hook in a parking lot with the shop crew standing around watching. Three measurements taken the week before have saved more jobs than anything clever done on the day.
- Clear opening width and header height at the door
- Machine width, depth, and height as it will be rigged
- Aisle width and turn radius inside the building
- Overhead obstructions along the path to the pad
The Last Few Feet, Level, and the Floor Under It
We do not try to fly a machine into a tight pocket between two others. The crane sets it close, on the floor, on machinery skates or rollers or a set of dollies. From there it travels the last few feet on the ground, where movement can be controlled in inches and stopped at any moment. Flying it in is how you scar the machine next to it.
Leveling comes after that. A precision level goes on the ways or the table, and shim packs go under the feet until it reads true in both directions. On a machine with an anchor pattern, the holes get lined up before the shims are finalized, because chasing a bolt pattern after shimming means doing the whole job over.
One more question worth asking in an older building: what is the floor? A four inch slab poured decades ago with unknown reinforcement under it is not the same thing as a purpose built machine pad. Point loading a machine foot on a thin slab cracks it. That conversation belongs before delivery, with whoever knows the building.
How the job runs
Our Process
Step 1: Weight and Lift Points Confirmed
Nameplate weight, manufacturer data, or the crate tag gives the number. The manual or the machine itself gives the lift points. If there are none, we plan the rigging around the base or a solid frame member. Center of gravity gets estimated from where the head, ram, or motor sits before any rigging is chosen.
Step 2: Opening and Path Measured
Door width, header height, aisle width, and the machine's real dimensions with guards attached all get taped. That determines whether the machine goes through the opening, gets turned, gets partially stripped, or goes over the wall on the boom instead of through the door.
Step 3: Rigged and Test Lifted
Slings and chains go to frame lift points only, with the hook set over the heavy end. The machine comes up an inch and stops. We check how it hangs. If it leans or tries to rotate, it goes back down and the rigging gets adjusted before it travels anywhere.
Step 4: Set Close on the Floor
The crane lands the machine near its final spot, on skates, rollers, or dollies rather than directly on the pad. Getting it within a few feet is the crane's job. Covering the last few feet under control on the ground is safer and far more precise than boom motion.
Step 5: Leveled, Shimmed, Anchored
A precision level goes on the ways or table and shim packs go under the feet until it reads true both directions. Anchor holes get aligned before shims are final. Nothing is called done until the machine sits solid with no rock in any corner.
Scope
What Is Included
- Machine weight confirmed from nameplate or manufacturer data
- Rigging to designated frame lift points only
- Test lift to check balance before the load travels
- Door, header, and aisle dimensions taken beforehand
- Skates or rollers for the final positioning move
- Precision leveling and shim packs under the feet
- Rigging planned around the base when no lift points exist
Answers
Frequently Asked Questions
My lathe has no lifting eyes. What now?
That is normal on older machines. We look at the base casting and the frame for a place that can carry the load, usually under the bed or through a bar opening in the base, and rig there with padded slings and a spreader bar. Send photos of the base beforehand so the rigging is planned before the truck arrives.
The machine is wider than my roll up door.
Three options usually exist. Strip removable guards and handles to shrink the widest point, turn the machine ninety degrees so the narrow face leads, or bring it over the wall on the boom. Which one works depends on the header height and where the truck can set up outside. Measure the clear opening, not the frame.
Can you set the machine exactly in place between two others?
The crane gets it close and on the floor. From there it moves the last stretch on machinery skates or rollers, which is how a machine goes into a tight pocket without scarring its neighbors. Trying to fly a load into a slot with boom motion is how equipment gets damaged.
Do you level the machine, or is that on me?
Leveling and shimming to the pad are part of the placement. A precision level goes on the ways or the table, shim packs go under the feet, and the reading gets checked in both directions. Final precision alignment for a machine with a strict spec is usually the millwright or the manufacturer's tech, and we hand off to them level and stable.
How do I know if my shop floor will hold it?
In an older building you often do not, and that is the point. Slab thickness and reinforcement vary, and a machine foot concentrates a lot of weight into a small area. Ask whoever knows the building, or get the slab checked, before delivery. Spreading the load over a plate or pouring a proper pad are the usual fixes.
Can you unload it off the truck and leave it for later?
Yes. It comes off onto cribbing or blocking on solid ground near where it belongs, sitting stable and square so nothing distorts. Then we come back and place it once the pad, the power, or the space is ready. Plan on two visits, and pick blocking that will not sink into caliche after a rain.
Related Services
- Heavy Lifting and Equipment PlacementMobile crane work that sets heavy equipment in its final position, once.
- Industrial Equipment PositioningIndustrial equipment positioning in Lake Havasu City, Arizona. Short picks to tight tolerance inside a working plant, done inside the shutdown window.
- Rigging SupportRigging support in Lake Havasu City. Sling angles, hitch types, spreader beams, edge protection and center of gravity settled before the load leaves the ground.
- Machinery Moving and SettingCrane machinery moving and setting in Lake Havasu City, Arizona. Shop machines picked out of one building, hauled, and set level in the next one.
- Generator PlacementGenerator placement in Lake Havasu City, Arizona. We level the pad, spread the sling angle, and land the genset clean over the conduit stub ups.
- Transformer PlacementPad mount and oil filled transformer placement in Lake Havasu City, Arizona. Rigged to the base lugs, hung plumb, and landed over the vault window.
- Tank and Vessel LiftsCrane lifts for poly and steel tanks in Lake Havasu City, Arizona. Empty tanks act like sails, so wind, tag lines, and cradle slings govern the pick.
- Industrial Equipment PositioningIndustrial equipment positioning in Lake Havasu City, Arizona. Short picks to tight tolerance inside a working plant, done inside the shutdown window.
- Commercial Equipment LiftsRooftop commercial equipment lifts in Lake Havasu City, Arizona. HVAC units, cooler sections, and hood fans set over an open store without closing it.
Ready to schedule your lift?
Tell us the load, the site and the timing. We will confirm capacity, access and a window.