What You Receive After the Load Is Set
In Short
You get photos of the set load and notes on what we found. Damage photos are taken before setup. The record suits a project file or an HOA.
2 min readUpdated July 2026
After a lift, you receive photographs of the load in its final position, images of the site taken before the truck set up, and written notes on anything found during the work. Contractors can file that record with their project paperwork, and an HOA can accept it as proof the work was done.
Pictures Taken Before the Outriggers Drop
The most useful photos of a crane job are the ones shot before the crane does anything. Concrete driveways here crack. Some of those cracks have been there since the slab cured, and a homeowner who has parked over them for six years genuinely does not know they exist until a boom truck leaves and they go looking.
So the first thing that happens on arrival is a walk with a phone. Driveway surface, the apron at the street, curb, gate posts, pavers, any landscape edging near the pads, and the roof or wall the load will pass. Timestamped, wide enough to place them, close enough to read.
This protects both sides and it settles arguments before they start. If a crack was there at eight in the morning, there is a picture of it at eight in the morning.
The Handover Package
When the load is set and the rigging is off, the second round of photos gets taken. The item in its final position from two or three angles, the connection points or pad it is sitting on, and a wider frame showing its relationship to the structure.
Alongside the pictures come notes. Anything found on site that the owner should know about goes in writing: a soft spot in the yard that needed cribbing, an irrigation line that ran closer to the pad than expected, a section of block wall with a loose cap, or roof tile that was already cracked before anyone stepped near it.
For a seasonal owner in another state, that package is the whole job. It arrives by text or email the same day, and it means the person paying for the work can see what happened without flying in.
- Pre-work condition photos of driveway, curb, walls and roof
- Final position photos from multiple angles
- Wide shot showing the load relative to the structure
- Written notes on anything found during the work
- Date and location on the file set
Paperwork a Contractor Needs
General contractors are running a project file, and a crane visit is one line in it. What they usually want back is simple: proof the pick happened on the scheduled date, photographs showing the item landed where the drawing said it would, and a note of anything that changed on the day.
If your project requires a written lift plan before the crane arrives, ask when you book rather than the night before. Producing one means confirming load weight, pick and set radius, boom configuration and setup position in advance, and that is a conversation, not a form.
HOA boards want less. Usually a dated set of photos showing the equipment was set properly, the common area was left clean, and nothing was staged where it was not permitted. A short photo set with a date on it has closed more HOA questions than any letter.
How the job runs
Our Process
Step 1: Photograph the Site on Arrival
Before setup, the driveway, curb, walls, gates and any surface near the pads get shot. Existing cracks and chips are captured while the truck is still on the street.
Step 2: Note Conditions Found During Setup
Anything unexpected gets written down as it is discovered. Soft ground, a shallow utility, a loose wall cap or already-damaged roof tile all go in the record at the moment they turn up.
Step 3: Shoot the Load in Final Position
Once the rigging comes off, the set item is photographed from several angles along with its pad or connection points and a wider frame for context.
Step 4: Send the Package Same Day
Photos and notes go out by text or email while the job is fresh, so the owner, the contractor or the board has the record before the next trade shows up.
Scope
What Is Included
- Arrival walkthrough photos of driveway, curb and adjacent surfaces
- Written note of any site condition found during the work
- Final position photo set of the load and its support
- Same-day delivery of photos and notes by text or email
- Photo record suitable for a project file or an HOA submission
Answers
Frequently Asked Questions
Do you take photos or video I can keep?
Yes. Photos come standard and you get them the same day. If you want video of the pick itself, say so when you book so it can be set up without slowing the lift down.
Why photograph my driveway before you set up?
Because most driveways already have cracks and nobody remembers which ones. A dated photo set from before the outriggers went down tells the truth about what was there, which protects you as much as it protects us.
Can you provide a written lift plan for our project file?
Ask at booking. A written plan needs confirmed load weight, radius, boom configuration and setup position ahead of the day. Given that information in time, it can be produced before the crane arrives.
My HOA wants proof the work was done properly. What do you send?
A dated photo set showing the setup, the load in position, and the area left clean. Most boards accept that. If they want something more specific, tell us what they are asking for before the day.
More Guides
- What to Expect on Lift DayA walkthrough of lift day from arrival to departure, including how long each stage takes, what you can do, and why setup takes longer than the pick.
- Safety StandardsDaily equipment checks, sling inspection, load chart discipline, exclusion zones, weather limits, and the right to refuse a lift that does not add up.
- Client Preparation ChecklistA short customer checklist for the day before a lift: measurements to take, photos to send, people to have there and what to unlock or mark.
- Lift Planning BasicsWhat a lift plan contains, why even a small residential pick gets one, and what a written plan looks like when a project file needs documentation.
- How Mobile Crane Service WorksA mobile crane brings the machine and the operator to your site. Here is what happens from the first phone call through setup, the pick and pack up.
- Capacity and Reach ExplainedA 40-ton crane will not lift 40 tons at full boom. Here is what capacity ratings, load radius and 142 feet of reach actually mean for your job.
- Site Preparation ChecklistWhat to clear, move, unlock and check before a crane arrives. A prepared site keeps the visit short and stops problems being found at the worst moment.
- What to Expect on Lift DayA walkthrough of lift day from arrival to departure, including how long each stage takes, what you can do, and why setup takes longer than the pick.
- HVAC Unit Crane Placement GuideHow rooftop package units and condensers get craned on and off, how the work is sequenced with your HVAC contractor, and what a curb mismatch means.
- Truss Lifting Process and SafetyHow roof trusses get set with a boom truck: staging bundles, spreader bars, bracing, wind limits and keeping the crane in one position along the wall line.
Ready to schedule your lift?
Tell us the load, the site and the timing. We will confirm capacity, access and a window.